[期刊]
  • 《Journal of Environmental Engineering》 2022年148卷7期

摘要 : Sulfide generation rates in the force mains of four pump stations in Edmonton, Alberta, Canada, were evaluated in the field, and a continuous nitrate dosing was applied in the pump wet well of the Big Lake pump station to investig... 展开

相关作者
相关关键词