摘要 :
The Saturn accelerator, owned by Sandia National Laboratories, has been in operation since the early 1980s and still has many of the original systems. A critical legacy system is the oil transfer system which transfers 250,000 gal...
展开
The Saturn accelerator, owned by Sandia National Laboratories, has been in operation since the early 1980s and still has many of the original systems. A critical legacy system is the oil transfer system which transfers 250,000 gallons of transformer oil from outside storage tanks to the Saturn facility. The oil transfer system was identified for upgrade to current technology standards. Using the existing valves, pumps, and relay controls, the system was automated using the National Instruments cRIO FGPA platform. Engineered safety practices, including a failure mode effects analysis, were used to develop error handling requirements. The uniqueness of the Saturn Oil Automated Transfer System (SOATS) is in the graphical user interface. The SOATS uses an HTML interface to communicate to the cRIO, creating a platform independent control system. The SOATS was commissioned in April 2013.
收起
摘要 :
Trends in the type and number of US enhanced oil recovery (EOR) projects are analyzed for the period from 1980 through 1989. The analysis is based on current literature and news media and the Department of Energy (DOE) EOR Project...
展开
Trends in the type and number of US enhanced oil recovery (EOR) projects are analyzed for the period from 1980 through 1989. The analysis is based on current literature and news media and the Department of Energy (DOE) EOR Project Data Base, which contains information on over 1,348 projects. The characteristics of the EOR projects are grouped by starting date and process type to identify trends in reservoir statistics and applications of process technologies. Twenty-two EOR projects starts were identified for 1989 and ten project starts for 1988. An obvious trend over recent years has been the decline in the number of project starts since 1981 until 1988 which corresponds to the oil price decline during that period. There was a modest recovery in 1989 of project starts, which lags the modest recovery of oil prices in 1987 that was reconfirmed in 1989. During the time frame of 1980 to 1989, there has been a gradual improvement in costs of operation for EOR technology. The perceived average cost of EOR has gone down from a $30/bbl range to low $20/bbl. These costs of operation seems to stay just at the price of oil or slightly above to result in marginal profitability. The use of polymer flooding has drastically decreased both in actual and relative numbers of project starts since the oil price drop in 1986. Production from polymer flooding is down more than 50%. Long-term plans for large, high-cost projects such as CO(sub 2) flooding in West Texas, steamflooding in California, and hydrocarbon flooding on the North Slope have continued to be implemented. EOR process technologies have been refined to be more cost effective as shown by the continued application and rising production attributable to EOR. 8 refs., 6 figs., 13 tabs.
收起
摘要 :
Trends in the type and number of US enhanced oil recovery (EOR) projects are analyzed for the period from 1980 through 1989. The analysis is based on current literature and news media and the Department of Energy (DOE) EOR Project...
展开
Trends in the type and number of US enhanced oil recovery (EOR) projects are analyzed for the period from 1980 through 1989. The analysis is based on current literature and news media and the Department of Energy (DOE) EOR Project Data Base, which contains information on over 1,348 projects. The characteristics of the EOR projects are grouped by starting date and process type to identify trends in reservoir statistics and applications of process technologies. Twenty-two EOR projects starts were identified for 1989 and ten project starts for 1988. An obvious trend over recent years has been the decline in the number of project starts since 1981 until 1988 which corresponds to the oil price decline during that period. There was a modest recovery in 1989 of project starts, which lags the modest recovery of oil prices in 1987 that was reconfirmed in 1989. During the time frame of 1980 to 1989, there has been a gradual improvement in costs of operation for EOR technology. The perceived average cost of EOR has gone down from a $30/bbl range to low $20/bbl. These costs of operation seems to stay just at the price of oil or slightly above to result in marginal profitability. The use of polymer flooding has drastically decreased both in actual and relative numbers of project starts since the oil price drop in 1986. Production from polymer flooding is down more than 50%. Long-term plans for large, high-cost projects such as CO(sub 2) flooding in West Texas, steamflooding in California, and hydrocarbon flooding on the North Slope have continued to be implemented. EOR process technologies have been refined to be more cost effective as shown by the continued application and rising production attributable to EOR. 8 refs., 6 figs., 13 tabs.
收起
摘要 :
Gallium arsenide (GaAs) peeled film solar cells were fabricated, by Organo-Metallic Vapor Phase Epitaxy (OMVPE), incorporating an aluminum arsenide (AlAs) parting layer between the device structure and the GaAs substrate. This lay...
展开
Gallium arsenide (GaAs) peeled film solar cells were fabricated, by Organo-Metallic Vapor Phase Epitaxy (OMVPE), incorporating an aluminum arsenide (AlAs) parting layer between the device structure and the GaAs substrate. This layer was selectively removed by etching in dilute hydrofloric (HF) acid to release the epitaxial film. Test devices exhibit high series resistance due to insufficient back contact area. A new design is presented which uses a coverglass superstrate for structural support and incorporates a coplanar back contact design. Devices based on this design should have a specific power approaching 700 W/Kg.
收起
摘要 :
Reaction of the title compound, 1, with ethanedithiol in the presence of boron trifluoride etherate at -78 C is complete within five minutes. A single product, 2, was isolated from this reaction. The structure of 2 was established...
展开
Reaction of the title compound, 1, with ethanedithiol in the presence of boron trifluoride etherate at -78 C is complete within five minutes. A single product, 2, was isolated from this reaction. The structure of 2 was established by careful analysis of its proton and carbon-13 NMR spectra. Proton and carbon-13 NMR chemical shift assignments are given along with 13C(1H) NOE values and spin-lattice relaxation times for all carbon atoms in 2. The formation of 2 in this reaction is rationalized in terms of a concerted reaction in which BF3-promoted cleavage of the C(1)-C(2) alpha-bond in the substrate occurs with concomitant stereospecific exo attack by ethanedithiol upon C(8) in the substrate. Organic chemistry. (jes)
收起
摘要 :
Geometrically structured surfaces have become increasingly important to solar cell efficiency improvements and radiation tolerance. Gallium arsenide solar cells with a V-grooved front surface which demonstrate improved optical cou...
展开
Geometrically structured surfaces have become increasingly important to solar cell efficiency improvements and radiation tolerance. Gallium arsenide solar cells with a V-grooved front surface which demonstrate improved optical coupling and higher short-circuit current compared to planar cells were fabricated. GaAs homojunction cells were fabricated by organometallic chemical vapor deposition (OMCVD) on an n substrate. The V-grooves were formed on the surface with an anisotropic etch, and an n-type buffer and p-type emitter were grown by OMCVD, followed by ohmic contacts. Reflectivity measurements show significantly lower reflectance for the microgrooved cell compared to the planar structure. The short circuit current of the V-grooved solar cell is consistently higher than that of the planar controls.
收起
摘要 :
V-grooved GaAs solar cells promise the benefits of improved optical coupling, higher short-circuit current, and increased tolerance to particle radiation compared to planar cells. A GaAs homojunction cell was fabricated by etching...
展开
V-grooved GaAs solar cells promise the benefits of improved optical coupling, higher short-circuit current, and increased tolerance to particle radiation compared to planar cells. A GaAs homojunction cell was fabricated by etching a V-groove pattern into an n epilayer (2.1 x 10 to the 17th power per cu cm) grown by metalorganic chemical vapor deposition (MOCVD) on an n substrate (2.8 x 10 to the 18th power per cu cm) and then depositing and MOCVD p epilayer (4.2 x 10 to the 18th power per cu cm). Reflectivity measurements on cells with and without an antireflective coating confirm the expected decrease in reluctance of the microgrooved cell compared to the planar structure. The short circuit current of the V-grooved solar cell was 13 percent higher than that of the planar control.
收起
摘要 :
The results of laboratory tests performed on a Pilot Cell Battery Protection System, for use in photovoltaic power systems, shows this as a viable method of storage battery control. This method of limiting battery depth-of-dischar...
展开
The results of laboratory tests performed on a Pilot Cell Battery Protection System, for use in photovoltaic power systems, shows this as a viable method of storage battery control. This method of limiting battery depth-of-discharge (DOD) has several advantages including: (1) temperature sensitivity, (2) rate sensitivity, and (3) state-of-charge (SOC) indication. The pilot cell concept is of particular interest for stand-alone photovoltaic power systems. (ERA citation 06:023314)
收起
摘要 :
The computer was programmed to handle data, perform limit checks, control normal operation, take corrective actions, and initiate shutdown for a fuel-cell system. The system was operated under computer control for periods up to 30...
展开
The computer was programmed to handle data, perform limit checks, control normal operation, take corrective actions, and initiate shutdown for a fuel-cell system. The system was operated under computer control for periods up to 30 hr. The adequacy of the programming and interfacing techniques used was verified.
收起