摘要: One of the major obstacles to be overcome in extending the navigation season on the Saint Marys River was to develop methods to mitigate ice problems in and around the Soo Locks. The two major ice problems encountered were ice acc... 展开
作者 | Wuebben, J. L. | ||
---|---|---|---|
原报告号 | ADA213688 | 总页数 | 144 |
主办者 | Non Paid ADAS | ||
报告分类号 | [48H - Snow, Ice, & Permafrost, 48G - Hydrology & Limnology, 50B - Civil Engineering] | ||
报告类别/文献类型 | AD / NTIS科技报告 | ||
关键词 | Ice Marine transportation Navigation Saint Lawrence Seaway Accumulation Closures Control Damage Engineering Environments Erosion Floating bodies Fragments Hazards Ice formation Locks(Waterways) Quantity Response(Biology) Seasons Sediment transport Shores Spilling |