[科技报告]PB  4

摘要: The objective of this research project was to determine the impact of differential movement across a staged construction connection. Specifically, the research investigated the bond strength of reinforcing bars embedded within fre... 展开

翻译摘要
原报告号 PB2013102727 总页数 4
主办者 Federal Highway Administration
报告分类号 [50A - Highway Engineering50C - Construction Equipment, Materials, & Supplies]
报告类别/文献类型 PB / NTIS科技报告
关键词 Bridge decks   Connectors   Construction   Deflection   Bonding strength   Grouts   Joints   Precast concrete   Reinforcing bars   Research project  
相关作者
相关关键词