摘要: This study was intended to determine why it was necessary to replace the RockyPoint Viaduct (1954-1994), on the Oregon coast south of Port Orford, after a period of service that was much shorter than that of many other reinforced ... 展开
作者 | Cramer, S. D. Covino, B. S. Holcomb, G. R. Bullard, S. J. Russell, J. H. | ||
---|---|---|---|
原报告号 | PB2000107395 | 总页数 | 166 |
主办者 | Federal Highway Administration, Salem, OR. Oregon Div.;Oregon Dept. of Transportation, Salem. Research Unit. | ||
报告分类号 | [50A Highway Engineering , 50C Civil Engineering Construction Equipment,Materials, and Supplies] | ||
报告类别/文献类型 | PB / NTIS科技报告 | ||
关键词 | Bridge inspection Concrete durability Viaducts Corrosion Concrete properties Bridge decks Reinforced concrete Reinforcing bar Chlorides Diffusion Construction Oregon Salt water Maintenance Cathodic protection |