摘要 : This study proposes a quantitative measurement method for the value of building information modeling (BIM) implementation during the construction phase of a large-scale building project. From the case project, 472 value-assignable... 展开
作者 | Kim~ Seongah Chin~ Sangyoon Han~ Jintaek Choi~ Cheol-Ho |
---|---|
作者单位 | |
期刊名称 | 《Journal of Management in Engineering》 |
页码/总页数 | 05017005.1-05017005.10 / 10 |
语种/中图分类号 | 英语 / TU1 |
关键词 | Building information modeling (BIM) value Quantitative measurement BIM issue Issue analysis Contract budget (CB) |
DOI | 10.1061/(ASCE)ME.1943-5479.0000551 |
馆藏号 | TU-015 |