摘要 : The authors describe how the Korea Electric Power Corporation (KEPCO) has successfully completed twenty-four overhead transmission line upgrade projects in Korea from 1994 to 1997 for a total cost of US$54.6 million. Upgrades to e... 展开
作者 | Min Byong Wook Choi~ M. |
---|---|
期刊名称 | 《IEEE Computer Applications in Power》 |
页码/总页数 | P.36-39 / 4 |
语种/中图分类号 | 英语 / TM0 TK |
关键词 | Power generation economics Energy exchange Power transmission lines Conductors Distributed parameter circuits Economic forecasting Weather forecasting Conducting materials Power demand Poles and towers |
DOI | 10.1109/67.625372 |
馆藏号 | IELEP0068 |