[会议][s.n.]The 15th IAHR cooling tower and air-cooled heat exchanger conference & 2011 Annual symposium of Industrial Cooling Tower Study Committee of CSEE Thermal Power Chapter  Lu Hongqian, Shu Jiaqing, Ran Shuyuan

摘要: Time-interval method for structure reliability' is adopted to study wind load of reinforced concrete hyperbolic cooling tower shell during construction, based on 'the reliability of structures during construction equals to that du... 展开

翻译摘要
作者 Lu Hongqian   Shu Jiaqing   Ran Shuyuan  
作者单位
文集名称 The 15th IAHR cooling tower and air-cooled heat exchanger conference & 2011 Annual symposium of Industrial Cooling Tower Study Committee of CSEE Thermal Power Chapter
出版年 2011
出版社 [s.n.]
会议名称 International Association for Hydro-Environment Engineering and Research Cooling Tower and Air-cooled Heat Exchanger Conference;Annual Symposium of Industrial Cooling Tower Study Committee of CHINESE SOCIETY FOR ELECTRICAL ENGINEERING Thermal Power Chapter  
开始页/总页数 255 / 7
会议日期/会议地点 20111023-26 / Beijing;Beijing 会议年/会议届次 2011 / 15th;
中图分类号 TQ051.5  
关键词 cooling tower     wind load during construction     structures reliability     time-interval method  
馆藏号 N2012EMST0006452
相关作者
相关关键词