摘要: The main dam is 600 feet long with a hydraulic height of 21 feet. It contains a sheet piling and concrete upstream cutoff. The dike is 750 feet long with a hydraulic height of 13 feet height. The spillway's capacity with a 8-inch ... 展开

翻译摘要
原报告号 ADA1556406 总页数 159
主办者 Non Paid ADAS
报告分类号 [50B - Civil Engineering]
报告类别/文献类型 AD / NTIS科技报告
关键词 Earth dams   Seepage   High density   Vegetation   Downstream flow   Slope   Dams   Inspection   Massachusetts   Reservoirs   Pile structures   Sheets   Dikes   Concrete   Height   Ratings   Capacity(Quantity)   Spillways   Safety   Hazards   Deficiencies   Floods   Visual inspection   Notown Reservoir Dam   National Dam Inspection Program    