摘要: The dual goals of this study are to (1) determine if using a second grout will provide improved corrosion protection for the prestressing strands or result in accelerated corrosion and (2) determine the possible consequences of le... 展开
作者 | O'Reilly, M. Darwin, D. Browning, J. | ||
---|---|---|---|
原报告号 | PB2013103557 | 总页数 | 2 |
主办者 | Department of Transportation | ||
报告分类号 | [50A - Highway Engineering50C - Construction Equipment, Materials, & Supplies71G - Corrosion & Corrosion Inhibition] | ||
报告类别/文献类型 | PB / NTIS科技报告 | ||
关键词 | Grouting Prestressing strands Corrosion protection Bridges Chlorides Concretes Macrocell Portland cements Post-tensiong ducts Voids |