摘要: All reservoirs formed by dams on natural water courses are subject to some degree of sediment inflow and deposition. The problem confronting the project planner is to estimate the rate of deposition and the period of time before t... 展开
作者 | Strand, R. I. Pemberton, E. L. | ||
---|---|---|---|
原报告号 | PB95144085 | 总页数 | 60 |
报告分类号 | [50B Civil Engineering] | ||
报告类别/文献类型 | PB / NTIS科技报告 | ||
关键词 | Reservoir silting Sedimentation Sediment yield Reservoir storage Sediment load Sediment transport Sediment discharge Sediment distribution Reservoir operation Suspended sediments Sampling Depth Reservoirs Dams |