摘要:
This report, the third of four reports required under two tasks, discusses system level control actions and algorithms for their implementation. The report is directed at the projected DCS of the mid 1980's. It presents algorithms...
展开
This report, the third of four reports required under two tasks, discusses system level control actions and algorithms for their implementation. The report is directed at the projected DCS of the mid 1980's. It presents algorithms for automatic searches through the connectivity data bases developed in report 2 for determining potential circuit and trunk restoration routes. Other algorithms presented are aimed at adjusting the routing in the AUTOVON Network.
收起