摘要: The report describes corrosion tests conducted in the first 2 yr of a 5-yrproject on 14 inorganic-, ceramic-and metallic-clad reinforcing bars and 10 solid metallic alloy reinforcing bars. Test results obtained from wetting and dr... 展开
作者 | McDonald, D. B. Pfeifer, D. W. Blake, G. T. | ||
---|---|---|---|
原报告号 | PB97116180 | 总页数 | 114 |
主办者 | Federal Highway Administration, McLean, VA. Office of Engineering and Highway Operations Research and Development. | ||
报告分类号 | [50A Highway Engineering , 71G Corrosion and Corrosion Inhibition , 71J Iron and Iron Alloys] | ||
报告类别/文献类型 | PB / NTIS科技报告 | ||
关键词 | Reinforcing steels Corrosion tests Reinforced concrete Accelerated tests Bridge decks Titanium Ceramic coatings Copper coatings Stainless steels Chlorides |