[科技报告]AD  181

摘要: A dynamic, real-time simulation was conducted to evaluate triple simultaneousindependent parallel approach operations for the Dallas/Fort Worth (D/FW) Airport. The simulation was part of an ongoing effort to evaluate plans for inc... 展开

翻译摘要
相关作者
相关关键词