摘要: Time-interval method for structure reliability' is adopted to study wind load of reinforced concrete hyperbolic cooling tower shell during construction, based on 'the reliability of structures during construction equals to that du... 展开
作者 | Lu Hongqian Shu Jiaqing Ran Shuyuan | ||
---|---|---|---|
作者单位 | |||
文集名称 | The 15th IAHR cooling tower and air-cooled heat exchanger conference & 2011 Annual symposium of Industrial Cooling Tower Study Committee of CSEE Thermal Power Chapter. | ||
出版年 | 2011 | ||
会议名称 | IAHR cooling tower and air-cooled heat exchanger conference;Annual symposium of Industrial Cooling Tower Study Committee of CSEE Thermal Power Chapter | ||
页码 | p.255-261 | 开始页/总页数 | 00000255 / 7 |
会议日期/会议地点 | 2011 / Beijing(CN);Beijing(CN) | 会议年/会议届次 | 2011 / 15th;2011 |
中图分类号 | TQ051.5 TQ051.5 | ||
关键词 | cooling tower wind load during construction structures reliability time-interval method | ||
馆藏号 | P1201716 |