摘要: According to the fact that the blasting site is surrounded in three sides by buildings and one side by main street called Zhongshan Road, for the protection of the surrounding residential building, office building, all kinds of fa... 展开

翻译摘要
作者 XU Liren  
作者单位
文集名称 New development on engineering blasting.
出版年 2011
会议名称 Asia-Pacific symposium on engineering blasting;APS blasting 3;International conference on physical problems of rock destruction  
页码 p.337-341 开始页/总页数 00000337 / 5
会议日期/会议地点 2011 / Xiamen(CN);Xiamen(CN);Xiamen(CN) 会议年/会议届次 2011 / 3rd;3rd;7th
中图分类号 TB41   TB41  
关键词 building   folding collapse   blasting demolition   touchdown vibration   blasting effect  